A Project of Etihad Group
Why choose Indus Steel?
Integrated melting, captive renewable power, and rebar capacity — quality steel for Pakistan’s builders and industry from Rahim Yar Khan.
250KMT
Melting capacity / year
200KMT
Rolling mill target / year
37.2MW
Captive bagasse power
73Acres
Rahim Yar Khan site
Products
Steel that builds trust
From billets to reinforcement — engineered for Pakistan’s construction and industrial value chain.
How our steel changes the game
Power. Melt. Roll.
01
Power Plant
37.2 MW bagasse-based power to support competitive, resilient mill operations.
02
Melting
Scrap-to-billet melting designed for consistent chemistry and reliable semi-finished supply.
03
Rolling Mill
Planned rolling mill extending billets into construction-grade reinforcement.






Facility
Rahim Yar Khan industrial complex
An Etihad Group steel venture at Village Karamabad — ≈73 acres dedicated to melting, power plant, and rolling mill.
Gallery uses representative industrial photography until official plant assets are supplied.
Know more about the site →Ready for specs, supply, or a site discussion?
Talk to Indus Steel — a project of Etihad Group.